Andorra FEDA Electricity & Utility Bill Calculator
Model your domestic electricity and municipal utility expenses in the Principality of Andorra. Compare FEDA's Tarifa Simple (Flat Rate) against Tarifa amb Discriminació Horària (Dual Time-of-Use), calculate fixed capacity charges (potència contractada in kW), digital meter rental, parish water fees, and statutory 4.5% IGI.
Utility Contract & Consumption Currency: EUR (€)
Understanding Andorra FEDA Electricity & Public Utility Invoices
Forces Elèctriques d'Andorra (FEDA) provides clean, highly reliable electricity backed by domestic hydroelectric generation (Engolasters) and high-voltage interconnects with RTE (France) and Red Eléctrica (Spain):
1. Competitive Rates
Andorran residential power rates (~€0.1285/kWh) and modest 4.5% IGI indirect tax are among the most economical in Western Europe.
2. Time-of-Use Optimization
Switching to Discriminació Horària lowers rates during night hours (22:00 to 12:00) and all 48 hours of weekends.
3. Right-Sizing Capacity
Ensure your contracted kW corresponds to true peak simultaneous demand to avoid paying unnecessary fixed monthly capacity fees.
Utility Billing Model Authored by Engr. Muhammad Shahzad
Lead systems engineer and financial model architect. Verified against official Forces Elèctriques d'Andorra (FEDA) domestic retail tariffs, Comú sanitation rates, and Llei de l'IGI statutory regulations.
Frequently Asked Questions
Who provides electricity distribution and retail supply in the Principality of Andorra? ▼
Electricity in Andorra is managed by Forces Elèctriques d'Andorra (FEDA), the state-owned public utility responsible for national power generation, cross-border imports from France and Spain, transmission, and domestic retail distribution.
What is the difference between Tarifa Simple and Tarifa amb Discriminació Horària? ▼
Tarifa Simple charges a single constant flat rate per kilowatt-hour across all 24 hours of the day. Tarifa amb Discriminació Horària splits consumption into Peak hours (Hores Punta) at a higher rate and Off-Peak hours (Hores Vall) at a discounted rate, rewarding consumers who shift heating or EV charging to night hours and weekends.
How is the fixed contracted power charge (Potència Contractada) calculated by FEDA? ▼
The power term is a fixed monthly capacity charge billed per kilowatt (kW) of contracted electrical capacity (ranging typically from 3.3 kW for small apartments to 14.4 kW for large chalets with heat pumps), payable regardless of actual energy consumed.
What statutory IGI tax rate applies to residential electricity invoices in Andorra? ▼
Residential electricity supply, contracted power capacity, and smart meter rental fees are subject to the standard 4.5% Impost General Indirecte (IGI) rate, which is significantly lower than neighboring French (20% TVA) and Spanish (21% IVA) utility taxes.
Are municipal water supply and sanitation charges billed alongside FEDA electricity? ▼
Drinking water supply and wastewater sanitation are administered independently by each parish municipality (Comú). However, households budget them jointly as essential utility costs, typically averaging €18 to €35 per month depending on parish and consumption.
How do smart electronic meters (comptadors intel·ligents) work in Andorra? ▼
FEDA has deployed digital smart meters across all seven parishes. They transmit automated telemetry readings, eliminating estimated billing, and enable remote power capacity upgrades without requiring a technician visit. Smart meter rental is billed monthly at approximately €1.80.