⚡ GRENLEC • PURC Regulated • Fuel Adjustment • 99 kWh VAT Threshold

Grenada GRENLEC Electricity Bill Calculator

Simulate monthly GRENLEC electricity charges in Grenada: accounts for base non-fuel tariffs, monthly fuel surcharge adjustments, and the 99 kWh statutory VAT exemption.

Preset Domestic Usages:

⚙️ Monthly Consumption & Fuel Rate

kWh
XCD / kWh

Monthly fluctuating charge set by GRENLEC and verified by PURC.

Estimated Monthly Electricity Bill
$286.93 XCD

Effective Cost: $1.15 XCD / kWh ($0.43 USD)

Monthly Cost Decomposition

Non-Fuel Energy Base: $112.00 XCD
Fuel Surcharge Adjustment: $137.50 XCD
Subtotal Energy Charges: $249.50 XCD
Value Added Tax (15.0% VAT): $37.43 XCD
USD Equivalent Bill: $106.27 USD

⚡ GRENLEC Domestic Tariff Architecture

Consumption Tier Non-Fuel Base Rate Fuel Surcharge VAT Status
First 50 kWh (Lifeline) $0.4000 XCD / kWh Monthly PURC indexed 0% VAT (if total ≤ 99 kWh)
51 to 99 kWh $0.4600 XCD / kWh Monthly PURC indexed 0% VAT (if total ≤ 99 kWh)
100+ kWh (Standard) $0.4600 XCD / kWh Monthly PURC indexed 15.0% VAT applied to entire bill
MS

Engr. Muhammad Shahzad

Verified Compliance Author

Engr. Muhammad Shahzad is a verified compliance architect specializing in electrical power utility regulations, Caribbean energy tariff modeling, and PURC statutory billing algorithms in Grenada.

📊 Grenada Inland Revenue Division (IRD) & NIS Matrix

Statutory Component / Legal Deduction Item Calculated Amount (XCD)
Primary Net / Statutory Payable Amount EC$ 0.00
MS

Engr. Muhammad Shahzad

Principal Financial Systems Architect & Eastern Caribbean & State of Grenada Fiscal Systems Lead

Lead software and systems architect specializing in high-performance browser computing, algorithmic validation, financial models, and zero-telemetry client-side privacy architecture.

Verified Profile & Methodologies →