EDF Archipel Guadeloupe • SAUR Saint-Martin • EEASM Tarifs Réglementés

Saint-Martin Electricity & SAUR Water Calculator

Estimate monthly utility bills: EDF Archipel Guadeloupe Tarif Bleu electricity (kWh & kVA subscription), SAUR desalinated water tiers, sanitation fees, and 4% TGCA in EUR and USD.

Common Household & Commercial Profiles:

Monthly Consumption Parameters

Regulated Tarif Bleu rate: ~€0.2516 per kWh.

1 m³ = 1,000 liters. Progressive tiered billing by SAUR.

Conversion: €1.00 EUR ≈ $1.08 USD.

Monthly Utility Bill Breakdown (TTC)

Total Combined Monthly Utilities:
€0.00
≈ $0.00 USD
EDF Electricity Subtotal: €0.00
EDF Energy (kWh) + Fixed Meter: €0.00
SAUR Desalinated Water Tiers: €0.00
Sanitation & Water Subscription: €0.00
Turnover Tax (4.0% TGCA): €0.00
Péréquation Protection: Without French national tariff equalization, electricity in Saint-Martin would cost roughly 3x higher due to isolated heavy fuel generation costs at Galisbay.

Saint-Martin Utility Production & Tariffs

Public utility services on the French side of Saint-Martin operate under a regulated framework designed to ensure resource sustainability in an insular Caribbean environment.

Tariff Mechanisms

  • EDF Tarif Bleu: Regulated by the French Commission de Régulation de l'Énergie (CRE). Incorporates a fixed monthly subscription determined by power demand (kVA) and metered consumption at ~€0.2516/kWh.
  • SAUR / EEASM Desalinated Water: Reverse osmosis production requires substantial energy. Tariffs follow a progressive scale starting at €4.80/m³ up to €9.80/m³ for high consumption.
  • TGCA (4.0%): Applies to utility delivery services in lieu of national French VAT.

Frequently Asked Questions about Saint-Martin Electricity & Water

Who provides electricity and drinking water in French Saint-Martin?

Electricity is generated and distributed by EDF Archipel Guadeloupe via the Galisbay thermal power plant. Potable drinking water is desalinated through reverse osmosis and distributed by SAUR Saint-Martin under the delegation of the public water board EEASM (Établissement des Eaux et de l'Assainissement de Saint-Martin).

Does Saint-Martin benefit from French national electricity tariff equalization?

Yes. In accordance with the French national equalization mechanism (péréquation tarifaire nationale), Saint-Martin residents benefit from regulated residential electricity prices (Tarif Bleu) subsidized by the national CSPE, protecting households from the actual high generation costs of local diesel fuel.

How are residential EDF electricity bills calculated in Saint-Martin?

Bills comprise: 1) A fixed monthly meter subscription fee (abonnement) based on contracted electrical capacity (e.g., 6 kVA, 9 kVA, or 12 kVA); 2) Active kilowatt-hour consumption charged at regulated Tarif Bleu base rates (~€0.25/kWh); and 3) Saint-Martin's 4.0% TGCA.

How is desalinated tap water billed by SAUR Saint-Martin?

Potable water produced by seawater desalination is billed per cubic meter (m³) through progressive blocks: Tier 1 (1–15 m³ at ~€4.80/m³), Tier 2 (16–30 m³ at ~€7.20/m³), and Tier 3 (>30 m³ at ~€9.80/m³), plus a fixed monthly service subscription fee and collective wastewater sanitation charges.

Is Saint-Martin TGCA (4%) assessed on domestic utility invoices?

Yes. Invoices issued by EDF Archipel Guadeloupe and SAUR Saint-Martin incorporate the statutory 4.0% Taxe Générale sur le Chiffre d'Affaires (TGCA), which replaces mainland French VAT.

Can utility bills be converted and paid in US Dollars (USD)?

Official utility bills are issued in Euros (€), the legal currency of the Collectivité de Saint-Martin. However, banks and payment portals facilitate real-time conversion into US Dollars ($) at prevailing exchange rates.

ES